Handyman Axarquia logo
HANDYMAN AXARQUIA
Home / Services / Bathroom Renovations

Bathroom renovations in the Axarquia

Strip-out to silicone in one to two weeks — plumbing, waterproofing, tiling and fitting by one team, with a written fixed quote.

Complete bathroom renovations

A dated bathroom drags a whole property down — and in rental homes it's the first thing guests photograph. We renovate bathrooms across the Axarquia from strip-out to silicone: plumbing, electrics, waterproofing, tiling, fittings and finishing, all by one team on one schedule.

  • Full bathroom refits, typically completed in one to two weeks
  • Bath-to-shower conversions and walk-in showers
  • Level-access wet rooms — ideal for accessibility and small spaces
  • New sanitaryware, vanity units, mirrors and heated towel rails
  • Proper tanking/waterproofing before a single tile goes on
  • Ventilation to keep mould away for good

Designed around real use

Holiday home, rental property or full-time residence — each needs different choices. Rentals need robust, easy-clean surfaces and fittings that survive guests; retirement homes benefit from level access and grab-rail-ready walls. We'll advise on what actually works, not just what looks good in a showroom.

A clear, fixed process

You get an itemised quote, a start date and a realistic duration. We protect the rest of your home, manage our own waste, and keep water off for the shortest time possible — usually you're never without a working bathroom overnight when the property has a second one.

Get a free quote

Tell us about your project and we'll get back to you the same day with a no-obligation estimate.

Message us on WhatsApp +34 711 027 432

Free quotes · 50% deposit to book, balance on completion · 12-month workmanship guarantee.

FAQ

Frequently asked questions

How much does a bathroom renovation cost?

A complete standard-size bathroom refit in the Axarquia typically runs €4,500–€9,000 depending on fittings and tiles, with wet rooms and premium finishes above that. Your quote itemises everything so you can adjust choices to budget.

How long will I be without a bathroom?

A typical full refit takes 7–12 working days. Water is only off for short periods, and where the property has a second bathroom you'll never be without one overnight.

Can you convert my bath to a walk-in shower?

Yes — it's our most requested bathroom job. Including new tray, screen, tiling and plumbing, most conversions take 3–5 days.

Do you waterproof before tiling?

Always. Wet zones are tanked with a waterproof membrane before any tile goes on. It's invisible when finished, and it's the difference between a bathroom that lasts and one that leaks into the flat below.

Ready to start your project? Let's talk.

Free, no-obligation quotes across the Axarquia. Call, WhatsApp or send us a message — we answer the same day.